e-news from Pepperl+Fuchs for the Process Automation Industry
Interface Technology
 
WirelessHART products finally available

WirelessHART Is Finally Available

If you are looking for mobility, flexibility, or alternatives to cables, WirelessHART is the right choice! We make it simple and easy with the new WirelessHART Gateway, Adapter and Temperature Converter …

Fieldbus Infrastructure
 
Fieldbus Advanced Diagnostic Manager Upgrade

Fieldbus Advanced Diagnostic Manager Upgrade

The newest version of FieldConnex Diagnostic Manager offers multiple detailed enhancements. It includes an integrated expert system that makes fieldbus monitoring even more efficient …

Remote I/O Systems
 
ETHERNET Remote I/O

Faster Data Transfer Rates for ETHERNET Remote I/O Using Modbus TCP

ETHERNET Remote I/O is easy to integrate into existing systems. Higher transfer rates up to 100 Mb/s are possible in combination with the Communication Interfaces for Modbus TCP Remote I/O …

Purge+Pressurization Systems
 
New 5000Q purge system

5000Q Purge and Pressurization System

With 5000Q, a brand new Zone 2 and 22 purge system is now available …

Industrial Monitors+HMI Solutions
 
VisuNet 22 Wide Screen Monitor

Wide Screen Monitors

VisuNet 22" wide screen monitors meet the graphic demands of leading DCS/PLC systems. These widescreen monitors are available for different operations like KVM extension, as a remote monitor, or a panel PC for use in the safe area or Division 2 …

Trainings+Seminars
 
Trainings from Pepperl+Fuchs

Trainings from Pepperl+Fuchs:
Lifelong Learning for Your Success

Get ready for the future, and take part in our seminars …

Events+Activities
 
NAMUR conference in China

Pepperl+Fuchs Sponsors 2nd NAMUR Conference 2010: NAMUR Activities in China

Pepperl+Fuchs will sponsor the 2nd NAMUR conference to be held 18-19 November 2010 at the Millennium Hotel in Shanghai, China …

 
Upcoming events of Pepperl+Fuchs

Pepperl+Fuchs Is Seen and Heard: Upcoming Events

It is desirable to share knowledge and information with your peers. We invite you to meet Pepperl+Fuchs at numerous fairs and other events …

Riddle
 
Riddle: Do you know the answer?

Do You Know the Answer?

Departing at the same time, 2 cyclists start off from either end of a 20 km (12.5 miles) route at a speed of 10 km/h (6.25 mph).

A dove flies at 20 km/h (12.5 mph) back and forth between the two cyclists until the cyclists meet.

How far does the dove travel?